Published : April 7, 2025
An AC interference study was conducted in 2021 following a utility development with the addition of a high voltage AC powerline in Alberta, Canada. The study comprised of 11 pipelines and 4 powerlines collocating in several stretches totalling approximately 50 km of collocation, with various […]
Published : March 29, 2017
An AC interference study was conducted in 2015 following the installation of a new 240 kV powerline in a remote area of Alberta, Canada. The calculations indicated severe risk of AC corrosion for the paralleling pipelines and safety hazards for pipeline personnel, especially under fault […]